Tree-related damage claims checklist - Post-damage checklist
In the event that the council receives written notification of a building or structure having already suffered damage, allegedly attributable to vegetation effect, then the council will require the following information:
Direct damage
- An accurate tree survey is supplied, which identifies:
- the trees implicated identified to genus and specie level
- the dimensions of any trees, recording height, crown spread (measured at the 4 cardinal compass points), trunk diameter. Measurements in metres and accurate to +/- 5%
- the age of the tree
- the distance of the implicated vegetation to the structure measured in metres.
- A detailed site plan is supplied, showing:
- all relevant features, e.g. trees, structures, roads and adjacent structures
- a north point
- the plan should be to scale or indicate critical measurements accurately.
Indirect damage
- An accurate tree survey is supplied, which identifies
- the trees implicated identified to genus and specie level
- the dimensions of any trees, recording height, crown spread (measured at the 4 cardinal compass points), trunk diameter. Measurements in metres and accurate to +/- 5%
- the age of the tree
- the distance of the implicated vegetation to the structure measured in metres.
- A soil profile sample taken in proximity to the buildings foundation and accurately indicated on an appropriately scaled map. The sample should indicate:
- the dept of the trial hole investigation
- the depth at which the soil sample described was taken
- a soil profile from a recognised laboratory indicating:
- soil type
- liquid limit
- plastic limit
- plasticity index
- moisture content
- a professionally analysed record of any tree roots encountered indicating the genus of the tree the roots are from, their condition, and the depth they were found at.
- Details of the structure(s) affected, including:
- the age of the building
- the foundation depth
- the foundation type
- a crack monitoring record
- a level survey indicating distortion patterns
- the date that damage was first noticed and any remedial measures taken
- a building history indicating any modifications and/or extensions, including extensive landscape works.
- A detailed site plan is supplied, showing:
- all relevant features, e.g. trees, structures, roads and adjacent structures
- a north point
- the plan should be to scale or indicate critical measurements accurately.
For enquiries or further information, contact the clean and green team.